Office moving checklist

A timeline for an office move, from the first lease decision to the first week in the new space. Shorten it for a small office; stretch it for several floors.

Mover with a clipboard checking an inventory beside packed boxes

Six months before

Read both leases

Check the end date and notice period of the old lease, restoration duties (what must be removed or repaired) and the start date of the new one.

Name one move lead

One person who makes decisions and talks to the movers, the buildings and IT.

Set a budget

Moving, IT, furniture, disposal, new cabling and overlap rent. See what a commercial move costs.

Three months before

Get moving quotes

Ask for a walkthrough and a written quote listing each part of the move.

Plan the new floor

Desk numbers, rooms and where shared equipment goes. This becomes the label plan.

Plan the IT

Internet and phone lines ordered for the new space, cabling, and the shutdown order. See how to plan an IT move.

Decide what not to move

Old furniture and equipment for disposal, donation or resale.

One month before

Book both buildings

Freight elevators, loading docks and move hours at the old and the new site. Ask what insurance paperwork each building needs from the movers.

Street permits

If the truck will occupy a lane, a sidewalk or a metered space, check the city's permit rules. See your city on the locations page.

Tell people

Staff, clients, suppliers, the post office and anyone who delivers to you. Update your address online.

One to two weeks before

Crates arrive

Staff pack their desks and label each crate with the new desk number. See packing and crates.

Clear out

Shred old paper, empty the kitchen, and finish anything that does not need to move.

Confirm the schedule

Times for IT shutdown, movers and building access, sent to everyone involved.

Move day and after

  1. Shut down IT

    At the agreed time, in the agreed order.

  2. Move

    Furniture and crates go to the labelled rooms and desks. See after-hours moves.

  3. Walk through

    Check both sites with the crew lead: the new one is set up, the old one is empty.

  4. First week

    Collect the crates, fix small issues, and hand the old space back to the landlord.

Planning a business move?

Send the details and we reply by email with a written quote.

Get a quote